Friends, recently in the Lok Sabha, Union Finance Minister Nirmala Sitharaman has approved many agendas in which a huge budget has also been spent on Railways. Let me tell you that the 62 kilometer long railway line has to be prepared and built in the next 4 years.

Also read: मुजफ्फरपुर और सहरसा से भी चल सकती है वंदे भारत ट्रेन, जाने रुट व किराया

For this, the Board has also issued a letter recently in which it has been told that an amount of Rs 1 crore 55 lakh has been released for this fund. Also, for this, a list of places where bridges, culverts, stations and halts will be built for Arrah to Ballia rail line will be prepared and a report will be given by FSL itself.

Also read: बिहार में 1431.36 करोड़ से बनेगी फोरलेन सड़क, इन जिलों से गुजरेगी सड़क

Bihar’s Ballia MP Birendra Singh Mast had also talked to Railway Minister Ashwini Vaishnav and Railway Chairman regarding this. After meeting in December, a request was also made to approve the new railway line as soon as possible.

Also read: मुजफ्फरपुर, हाजीपुर, पाटलिपुत्र के रास्ते दिल्ली के लिए चलेगी स्पेशल ट्रेन, जाने किराया

And after the final report, all the bridges and culverts coming in the way will be identified. Besides, it will also contain details of station map and route. On the basis of which this process will be started. Regarding this, the local MP has said that the budget for this railway line was passed 50 years ago when the then Railway Minister was Ram Subhag Singh.

Also read: बिहार को वंदे भारत ट्रेन की सौगात, इन जिलों में चलेगी यह ट्रेन

Sonu Roy is originally a resident of Samastipur district of Bihar, has been working as a writer in digital journalism for the last 4 years. In his career of 4 years, he has good experience from politics, automobile, motivation, sports to technology field.