Bihar News: These days, a network of roads is being laid at a very fast pace in Bihar. Which means that very soon the work of Green Field Four Lane Expressway will start from Patna to Sasaram via Ara. This scheme has been given initial approval from the Center on September 27 itself.

If reports in the media are to be believed, the highway will be constructed between Sasaram and Ara in the first phase. In the first phase, 74 km road is to be constructed between Sasaram and Ara. For this, NHAI has started the tender process.

Also read: LIC की धांसू स्कीम, 45 रुपये निवेश बना देगी 25 लाख रुपये, जाने…

Also read: गुरुवार को बदला पेट्रोल-डीजल का भाव, जाने आपके शहर में क्या है रेट

Let us tell you that in the second phase the work will be done between Arrah and Patna. In the second phase, 45.5 km road is to be constructed between Arrah and Patna. This means that work on 119.5 km long green field highway worth Rs 3,357 crore is to be done.

Friends, for this, work of acquiring 550 hectares of land worth Rs 760 crore will also be done. And the most important thing is that it has got the status as NH 119A. After which the problem of traffic jam in Bihar will reduce.

Raushan Kumar is known for his fearless and bold journalism. Along with this, Raushan Kumar is also the Editor in Chief of apanabihar.com. Who has been contributing in the field of journalism for almost 4 years.