Friends, work is going on on many different types of projects in the country. In which one project is being built at Lavkush intersection of Indore-Ujjain Road. There is also a magnificent long and wide double flyover. The maximum height of this sliver will be 70 feet.

Also read: Vande Metro Train: बिहार में अब चलेगी वंदे मेट्रो ट्रेन, जाने कौन से जिले से चलेगी

Friends, generally the height of the bridges built is 30 to 40 feet. But the height of this bridge being built in Ujjain is almost double its height of 70 feet. The reason for the height of this bridge is the metro train track.

Also read: मुंबई से यूपी-बिहार आना हुआ आसान, चलेंगी 12 समर स्पेशल ट्रेनें

Also, the length of this flyover is also not less. The length of this flyover is above about 1 kilometer. Regarding the length, it has been said that due to this the vehicles do not have to face much slope and climb. The bridge will be made of six lanes.

The height of the bridge to be built from Gandhi Nagar intersection towards MR-10 will be below the metro track. Besides, a metro station is also being constructed at the intersection. The first double decker bridge on the highway in the state is being built in Indore. The cost of this bridge is about Rs 175 crore.

Sonu Roy is originally a resident of Samastipur district of Bihar, has been working as a writer in digital journalism for the last 4 years. In his career of 4 years, he has good experience from politics, automobile, motivation, sports to technology field.